| Location of performance / Site: | Irsching, Vohburg an der Donau, Bavaria, Germany, Europe |
|---|---|
| Execution time since: | Sep 2018 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Schrobenhausen |
| Treatment methods: | Activated carbon filtration, Gravel / Sand filtration |
|---|---|
| Pollutants: | Capstone products A and B (CDPOS and DPOSA), PAH, Perfluorinated alkyl substances (PFAS), Perfluorooctane sulfonic acid (PFOS) |
| Other technical conditions: | Automatic filter backwash, Control technology with remote access, Data storage, Data storage online |
| Volume flow: | 150 m³/h |