Hamburg, reconstruction, modernization and operation of a water treatment plant on the site of a former chemical factory

In order to secure a contaminated site, the main source of contamination is hydraulically secured and the contamination line is remediated by Pump and Treat. For this purpose, a water treatment plant is operated in a specially built hall.
Service Provider

BAUER Resources GmbH

BAUER-Straße 1 / 86529 Schrobenhausen
Project
Location of performance / Site: Andreas-Meyer-Straße, Hamburg, Germany, Europe
Period: Jan 2018 - Dec 2023
Responsible company location: BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Hamburg
Project Partners:
BAUER Resources GmbH: Sludge storage tank and water activated carbon filter WBA Hamburg
Description

In order to secure the contaminated site, formerly used as a production site for the chemical industry, it was surrounded with a sealing wall. Water contaminated with chlorinated hydrocarbons (HCH, chlorinated benzene and phenols) is pumped out of this sealing wall pot and fed to a treatment plant together with groundwater from the outflow plume. In addition to the pollutants, the water contains dissolved iron and manganese. The de-iced water is fed to an activated carbon filtration system by means of aeration and precipitation/flocculation treatment and after oxygen saturation, is discharged directly into the receiving water.

In addition to water treatment, the exhaust air is cleaned and the iron hydroxide sludge produced is dewatered at the point of origin using decanters.

The entire system technology had to be modernized and expanded after more than 20 years of use. This happened during ongoing operation.

The modernized system runs 24/7 with a throughput of up to 38 m³/h. A remote access and dedicated fault reporting system, as well as process data storage and visualization are installed.

Groundwater Remediation Properties
In-situ process: Pump and Treat
Area: 1200 m²
Treatment methods: Activated carbon filtration, Precipitation / Flocculation, Solids sedimentation, Sludge dewatering
Pollutants: Ammonium (NH4), CHC / HVOC, CSB, Dioxins, Plant protection products, Phenols / Chlorophenols
Other technical conditions: Automatic filter backwash, Sludge storage, Control technology with remote access, Data storage online
Volume flow: 38 m³/h
Depth of load: 20 m
Details about the services provided
  • Groundwater remediation work

    Consulting

    Selection of the appropriate process technology, arrangement of the components

  • Groundwater remediation work

    Planning

    Plant planning

  • Groundwater remediation work

    Plant construction

    Complete production of the base plate, housing and process engineering system

  • Groundwater remediation work

    Operation

    Ensuring operation and readiness, as well as maintenance and revision

  • Groundwater remediation work

    Occupational safety and emission protection

    Ensuring the necessary occupational safety and emission protection

  • Groundwater remediation work

    Monitoring

    Provision of stand-by personnel with remote control technology and emergency equipment

  • Groundwater remediation work

    Maintenance

    Implementation of the planned maintenance tasks

  • Groundwater remediation work

    Monitoring

    Control of the monitoring network and maintenance of all necessary components