| Location of performance / Site: | Oberneul 7, Aichach, Bavaria, Germany, Europe |
|---|---|
| Period: | May 2012 - Apr 2026 |
| Responsible company location: | BAUER Resources GmbH, Bereich Bauer Umwelt, Standort Schrobenhausen |
Construction and operation of the following plant technology:
Pollutants: iron, manganese, arsenic (III), arsenic (V), ammonium
| Treatment methods: | Bioreactor, Precipitation / Flocculation, Solids sedimentation, Sludge dewatering, Gravel / Sand filtration |
|---|---|
| Pollutants: | Ammonium (NH4), Arsenic, Iron, Manganese |
| Other technical conditions: | Automatic filter backwash, Control technology with remote access, Data storage online |
| Volume flow: | 20 m³/h |